: Public <<Operation>> Operation
| Created: |
12-Apr-11 15:32:22 |
| Modified: |
02-Jul-11 13:57:52 |
|
Project: |
|
| Author: |
Jean-Luc |
| Version: |
|
| Phase: |
1.0 |
| Status: |
Proposed |
| Complexity: |
Easy |
| Difficulty: |
|
| Priority: |
|
| Multiplicity: |
|
Advanced: |
|
| UUID: |
{31C94B08-A078-44d3-AB3E-5B6CC04FA111} |
| Appears In: |
LoadModel, LoadModelNotes |
An active power (Y1-axis) and reactive power (Y2-axis) schedule (curves) versus time (X-axis) for non-conforming loads, e.g., large industrial load or power station service (where modeled)
- Associations From
- Tagged Values
- Other Links
| Element |
Source Role |
Target Role |
«Operation» NonConformLoadGroup
Operation
|
Name: NonConformLoadGroup
The NonConformLoadGroup where the NonConformLoadSchedule belongs.
|
Name: NonConformLoadSchedules
The NonConformLoadSchedules in the NonConformLoadGroup.
|
 Details:
|
| Tag |
Value |
| GUIDBasedOn |
{41B7642C-D924-4ebf-9AE9-4BD3706390FD} |
 Details:
|